1. Pumpkins acquired, of great number and size
2. Large fibreglass pot leveled and positioned
3. Trellises in place
4. Many rows of knitting ripped out (of the 2 rows forward, 1 back variety)
5. Concrete slabs in place along boulevard
6. 9 boxwoods planted (yay! they were on sale after all!)
7. Cluster of hydrangeas panting to get into the ground
8. Overall knitting status: back done, both fronts done, 1 sleeve mostly done
9. No additional sleep banked
and
10. Bonus discovery: Ghirardelli instant hot chocolate is the new black
No comments:
Post a Comment